10th Jun 2024

Digital construction at Museum of London

Our project team spoke to Construction Management about the digital strategy and tools used to transform the Smithfield market into the London Museum.

Read “McAlpine thinks smart at Museum of London” in Construction Management.

Project Director, Richard Hill, and Senior Digital Construction Manager, Irina Gales, speak to Construction Management about the works that is currently taking place to transform the Smithfield market into a smart building, set to open in 2026 as the London Museum. They focus particularly on the digital tools and strategy that the team has adopted.

The approach is also helping to create the most sustainable museum possible, embracing the circular economy through the principles of reduce, re-use and recycle and targeting a BREEAM Outstanding rating. The team is seeking to retain and recycle 70% of the existing building fabric and reduce operational carbon through smart technologies that will monitor and improve performance over time. As we approach the completion of the Museum of London's digital construction, our innovative strategies and smart building technologies promise a sustainable and state-of-the-art museum experience.

Read the full article in Construction Management Magazine


We are pushing the boundaries with respect to smart buildings, workflow and data creation processes that are not yet industry standard. We have established our own way of working, drawing on experience from our supply chain members and from the client.

Irina Gales

Irina Gales, Senior Digital Construction Manager, Sir Robert McAlpine


  1. Sustainability

    We are committed to leaving a lasting positive legacy as a result of our actions. Considering our impact on the environment and society in all we do. Playing our role in addressing the climate emergency for a sustainable and prosperous future.

    Read more about
  2. Building a sustainable future: Our pathway to Net Zero 2045

    10 Oct 2023

    Climate change is one of the biggest challenges we face. We're pleased to introduce our new microsite: Net Zero 2045 detailing our pathway to Net Zero and our commitment to construct a better world for future generations.

    Read more about
  3. Digital Construction

    We invest in industry-leading software and mobile applications. So we can deliver cost efficiencies and top performance - each and every time.

    Read more about

Latest news

  1. Tolworth’s Tala Building progress delights stakeholders

    04 Aug 2026

    Local politicians were among those who joined tours of the new mental health facilities set to open in 2028

    Read more about
  2. HS2 signs new civil engineering deals

    03 Aug 2026

    HS2 Ltd has successfully renegotiated contracts with two of the civil engineering joint-ventures building Britain’s new high-speed railway as part of the programme reset.    

    Read more about
  3. IHP appointed to deliver new Leighton Hospital in Crewe

    30 Jul 2026

    Integrated Health Projects (IHP), the joint venture between VINCI Building and Sir Robert McAlpine, has been appointed to build the new Leighton Hospital in Crewe.

    Read more about
View all news