More than 30 years of working at Sellafield
With a continuous presence of 33 years at Sellafield from 1984 to 2017, we are proud to have been responsible for a vast number of the building and civil engineering aspects of the Cumbria plant’s fuel reprocessing and waste management facilities.
Contracts included the THORP Receipt and Storage Ponds, the Medium Active Solid Waste Encapsulation Plants EP1 and EP2, the Mixed Oxide Fuel Plant, the Drypac Plant, the Combined Heat and Power Plant and refurbishment of the Sealine Pipe Bridge.